Major Projects

Asphalt

We have completed so many asphalt project. These project involved the installation of a new asphalt surface to replace the existing worn-out driveway.

Continue

Grading

We have vast experience with grading projects. The project involved the grading and leveling of the site to prepare it for construction.

Continue

Riprap

Riprap Projects involved the installation of riprap, a layer of durable rocks or concrete blocks, to prevent erosion and provide shoreline stabilization.

Continue

Formwork & Steel

Our expertise in precise formwork construction and steel fabrication played a vital role in the successful completion of this project.

Continue

Projects List

Here find some of our major projects starting from 2013 to present.
Sn Project Details Location Year Project value
(Omani Riyal)
1 Graded work of Access Road with Bahwan Engineering Company (BEC) Ibri Grid Station 2018 17,000.000
2 Car Parking Asphalt work Dragon Mart, Barka 2015 88,000.000
3 All Service roads Asphalt work Dragon Mart, Barka 2015 55,000.000
4 Adam Majlis road and graded work with private & municipality Majlis 2016 37,500.000
5 Internal access Asphalt work Adam Al Falaj 2016 33,200.000
6 Internal road and Asphalt work Khabura 2016 28,400.000
7 Petrol Stations Grader and Asphalt work Multi Location 2016 120,000.000
8 Construction of retaining wall and its associated Earth work and Graded work - 2017 36,000.000
9 Mass Earth work including grading – for Private and Government both Multi Location 2017 62,000.000
10 Nizwa Mosque external Grading work along with walk ways Nizwa 2016 32,300.000
11 Mudaybi Roundabout Earth work and Asphalt work Al Mudaybi 2015 126,700.000
12 Earth work and Asphalt work Samad al-Shan 2015 138,950.000
13 Protection and Graded works at the adjacent areas Supreme Court 2017 28,000.000
14 Gas pipeline protections and its associated Graded works adjacent to SQU Seeb 2018 18,000.000
15 Many other miscellaneous works i.e., Construction of Road hump for Ministry of regional municipalities and water resources Nakhal 2015-2020 77,000.000
16 Mass cut & fill works also Construction of shaded Car Parking Liwa 2018 167,000.000